Welcome to the Hillcrest Turf Blog. As our blog grows and develops we are creating a "year in review" and the blog with pictures and articles related to different problems and successes during the growing season remind us of the many improvements Hillcrest under goes every season.

Tuesday, October 25, 2011

New tees????








Here are some new locations for ladies tees in 2012. Hole #6 could be 50+ yards shorter (125 yards) and #16 could be as much as 60 yards shorter (120 yards) than the current tee boxes if this project is approved.


I have often believed that the ladies tees were positioned too far back and also believe that the tee space on our par 3's is too small. The construction of new tee's on these two par 3's allow for more tee space for the men and a more comfortable hole for the ladies.


My plan is to cut these areas down to tee height (did that today as you can see in the pictures) and when construction begins save the sod so the tee can be put into play as soon as possible. We want to excavate a larger area then you see in the picture so we can elevate the tee slightly and of course be left with a flat tee.


No time table is set for this project because it has not been approved yet. I would like to get #16 done early in the summer and #6 (requires more fill) completed late summer or early fall.




Friday, October 21, 2011

#8 drainage project complete.................

The drainage project on #8 is complete. The fairway lines have been adjusted and we will be evaluating the playability of the new fairway lines through the spring of next year. My current plan is to maintain this area at 1 and 1/4 inch.

We are also working on building 1 and maybe 2 new tees next year on #6 and #16 for the women. While nothing is approved I will be working on exact placement, size, and distance heading into the winter months.

Friday, October 14, 2011

#8 drainage








Today we trenched our drain lines, put in the drain tile with pea gravel, and put in some transfer boxes. There is about 100 ft of tile left to be laid and we should get to that Monday and complete our finish grade. If it stays dry I hope to get the sod finished next week too.




Wednesday, October 12, 2011



Today we trimmed some trees around the property. This is a before and after picture of one limb we trimmed that was hanging over #1 fairway. A member requested it be removed and I couldnt see why it needed to stay.


It would be better for the future if I took before and after photos from the same spot and with the same camera. It would make the differences a little easier to see.



#8 drainage project update.....

This project stalled out because of the rain last night. The rain did gives us a chance to check our work before we start trenching in our drainage system. I am shooting for starting our trenching on Friday this week.


Monday, October 10, 2011

#8 drainage project......

Here is the start of the drainage project across #8 fairway. Today we stripped and hauled away the old sod and started moving some dirt around to improve the surface drainage. We also located the irrigation lines. We probably wont hit any of those when we start putting in our subsurface drainage.

If things dry up on the site we could get most of our grading finished tomorrow and start trenching on Wednesday.