10 or more years ago when I was here it would take me 4 and 1/2 hours to mow tees and collars and now it is taking people 3 hours. Something must have changed and it isn't the mower. This picture is of #6 and I know that it excites everyone that this tee got moved back another 5 yards but if this adjustment allows us to use more of the existing tee then we have accomplished our goal. Our goal is to have flat tees, good grass to hit from, and be able to follow the basic rules for tee setup. One of those rules being the tees should be placed no closer to the back of the tee than two club lengths.
Keeping you better informed about daily tasks, project progress, and course conditions.
Welcome to the Hillcrest Turf Blog. As our blog grows and develops we are creating a "year in review" and the blog with pictures and articles related to different problems and successes during the growing season remind us of the many improvements Hillcrest under goes every season.
Thursday, September 29, 2011
tee adjustment............
10 or more years ago when I was here it would take me 4 and 1/2 hours to mow tees and collars and now it is taking people 3 hours. Something must have changed and it isn't the mower. This picture is of #6 and I know that it excites everyone that this tee got moved back another 5 yards but if this adjustment allows us to use more of the existing tee then we have accomplished our goal. Our goal is to have flat tees, good grass to hit from, and be able to follow the basic rules for tee setup. One of those rules being the tees should be placed no closer to the back of the tee than two club lengths.
Wednesday we trenched a new drainage line from the wash pad to another "drain field" or ditch. The area around the wash pad was not draining and all the water was starting to limit access to the shop and ruin the surrounding turf. This project should be finished up soon. To further improve the drainage we might add some drainage units to catch the grass clippings before the go into our drainage system.
#1 cart path exit............
Saturday, September 17, 2011
some small fall projects...............
our bentgrass nursery - The stripped area in the picture will be put into bluegrass this fall which we will be used for some fairway leveling next spring and early summer.
#11 collar repair - This year we are using bentgrass from our L-93 nursery which might help our success rate as this particular spot gets very hot in the summer.
This coming week we will be finishing some fairway aerification and overseeding, sodding a small area on #12 collar, making a fall broadleaf application around bunkers and the perimeters of the golf course, and detailing trees for the final time this season.
Friday, September 9, 2011
#14 fairway regrade and sod project
The remainder of the season this area will be mowed to 1 and 1/4 inch and next year in the spring we will re-draw the fairway to include this new area.
Once the sod is healed in along the cart path traffic will be able to continue as normal, but for now the best option is for cart traffic to vary the entry points and avoid the wettest parts of the new sod.
On Monday we will be deep-tining the greens and the course will be closed. The remainder of the week will be spent monitoring green recovery and repairing a few bad spots on collars #12 and #11 with our nursery bentgrass. If time allows I will also be addressing the exit point on #1 and #2 cart paths. We have a pallet of old pavers left over from a project and we will use those to make a smooth transition from path to turf.
Wednesday, August 31, 2011
Green adjustments........
The fairway adjustment are a little more abstract. I am trying to put each row of irrigation heads in the fairway. This is not possible on all the holes, but most fairways are being expanded in one spot or another.
We will also be going through all the tee complexes this fall to make any needed changes to the free flowing tees here at Hillcrest.
#14 fairway project...............
I could not take it anymore and decided I had to repair the uneven areas on #14 fairway that hold water way too long after even small rains. The areas hold water for so long ducks were starting to gather. Still on the late summer project list are repairs to a couple of collar areas, some more fairway interseeding, a number of stump holes to either seed or sod, and a couple of very small green surrounds to sod. I had to squeeze #14 in somewhere and this was the week.
October is reserved for adding sub surface drainage and re grading #8 fairway.
The lay of the land didnt leave a lot of options as far as subsurface drainage is concerned so basically we raised the area by about 3 inches and graded the section smooth with the surrounding fairway. On Friday we will be laying the sod.
This was a trial run for a couple of other areas that give us trouble coming out of spring and #14 has plenty of depressions and poorly drained areas that should be addressed, but this section is a nice start and fits our sod budget.